What's the level of impact your change management methodology is having on the organization? How can you assess how deeply embedded the methodology is across the enterprise?
The AIM (Accelerating Implementation Methodology) maturity curve can help you assess where you are today (the current state), and define where you would like to be (the desired future state.) Then you can use "AIM on AIM" to identify tactics and strategies for achieving the future you seek to see.
If you are stuck at a low level of maturity, you can see if you have the sponsorship you need to build to a higher maturity level.
The maturity curve for the AIM change management methodology is a 5 phase continuum from Introduction to Optimization:
Phase 1 Introduction via Education
Phase 2 Adhoc Application
Phase 3 Project Level Strategy
Phase 4 Enterprise/Program Level Strategy
Phase 5 Optimization
Where are you on the maturity curve? Where do you want to be? How will you get there?